Abstract

This paper presents a new method of determining the correction factor to approximate a jointed, shield-driven tunnel lining as a continuous ring structure under plane strain conditions. An earth pressure distribution pattern is proposed which is developed based on the long-term behavior of shallow tunnels constructed in soft clays as observed in the field. The "force method" was used to determine the internal forces and displacements of jointed, shield-driven tunnels. Either the vertical or the horizontal displacement of the tunnel lining can be used as a common matching parameter. Factors such as joint stiffness, soil resistance, joint distribution, number of joints, and tunnel geometry can be considered by the proposed method. Simplified design equations for the estimation of equivalence factors are also proposed for the typical tunnel lining geometry of urban subway tunnels. The proposed equivalence method was evaluated by comparing it with the results of laboratory tests.Key words: shield-driven tunnel, jointed segmental lining, effective bending rigidity ratio, equivalence factor, lining internal force, earth pressure distribution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.