Abstract
Abstract Established in 2008, the Enhanced Sealing Project (ESP) was the final full-scale experiment at the Underground Research Laboratory (URL) in Manitoba, Canada. As of January 2023, the project has been monitoring the evolution and performance of the full-scale composite shaft seal at the URL for over 16 years. The shaft seal was constructed in a 5-m-diameter circular shaft across a water bearing fracture zone at the depth of c. 270 m and comprises of 6-m-thick clay component that is sandwiched between two 3-m-thick concrete components. The clay component was made of 40% (by dry mass) of bentonite and 60% of fine aggregate mixture. This paper highlights the ESP results until early 2023. The ESP results, combined with the URL results from 1980s to 2013, provide 45+ years of unique data sets representing a lifecycle of an underground facility from pre-construction, operation, decommissioning, closure, and post-closure phases. This paper also examines the feasibility of the ESP extension beyond 2023 and proposes additional efforts that will enable to observe the evolution of the seal and URL for the longer term (e.g., several decades).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.