Abstract
This paper presents an overview of the Engineering Compliance Program (ECP) development process and its role in design. The ECP is a formal program to assess Nuclear Regulatory Commission (NRC) regulatory guidance in terms of precedence, industry experience documents, and codes and standards to determine their applicability to Mined Geologic Disposal System (MGDS) design. These determinations are documented in ECP Guidance Packages for MGDS Structures, Systems and Components (SSCs). This ensures that the license application appropriately reflects the MGDS design and facilitates NRC acceptance and compliance review.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.