Abstract

SUMMARY Single-stage job-shop scheduling has received a great deal of attention in the published literature. Significantly less research has been done in the area of assembly job shops. With the onslaught of MRP implementations designed to plan and control assembly job shops, practitioners have been confronted head-on with the need to improve dispatching procedures. This paper examines the effect of three different product structures on the performance of selected priority dispatching rules in a six-machine assembly job shop. Results indicate that significant relationships exist between the structure of the product bill of materials and the priority dispatching rule, and that specific rules are indeed better suited to certain product structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.