Abstract

Abstract This article extends the analysis of an earlier paper by the authors for a single product to lot size determination for manufacturing cycles of multiple products. The effects of production breaks, learning interactions due to commonality of tasks and different learning rates for products are considered in the formulation of an equation for the average production time per unit. The equation is applied to an equal lot size per product model. An analysis of a model restricted to equal production intervals per product per cycle is also presented. A sample problem is solved to demonstrate the application of the effects of learning to multiple product lot size determination.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.