Abstract
Purpose: To investigate the effectiveness and variance of a critical pathway (CP) for laparoscopic colon resection in colon cancer patients, and nurses’satisfaction with the CP. Methods: A CP for laparoscopic colon resection was applied to the CP-group that included 50 patients, who underwent elective colon resection between March and May, 2011. The non-CP group included 51 patients who had the same operation without the CP applied from March to May, 2010. Results: The means of length of hospital stay were 11.7 and 7.3 days (p<.001) and the lengths of postoperative hospital stay were 8.6 and 5.1 days (p<.001) in the non-CP group and CP group, respectively. There was no significant difference between two groups for total healthcare costs, pain score, complications, or emergency room visits within 30 days after discharge. By examining variances of the CP, there were 162 variances and the most frequent cause was patient’s condition. Nurses’satisfaction with the use of CP was favorable and the mean score of satisfaction was 3.76 on the 5 point Likert scale. Conclusion: There are clear benefits to use of CP, resulting in standardized and effective patient care. In conclusion, analysis of variance data can assist in evaluating and revising CP for optimal care and reducing variances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.