Abstract
Building the structural components is crucial for constructing a multi-story building. In the process of creating these components, which is commonly done through casting, a tool called formwork is required. Formwork is a tool used to mold the necessary concrete structures, ensuring that their shape and dimensions align with the concrete material's planning. Formwork tasks for concrete work significantly impact costs. Different formwork options, including traditional, semi-system, and full-system forms, are available. This research aims to assess cost-effectiveness through value engineering, specifically focusing on column formwork, by comparing their utilization in a multi-story construction project. The study begins by collecting primary data, namely working drawings, so that the volume of conventional formwork can be calculated. Then, budget planning calculations are made to analyze the cost comparison of each formwork alternative. The selection of the appropriate formwork affects the speed of execution and the costs incurredIn this construction project for the building, the conventional column formwork results in expenses amounting to IDR 587,749,263.04 and requires 28 days for completion, while semi-system column formwork achieves a 37% cost saving with the same duration of 28 days, and full-system column formwork becomes 64% more cost-effective with a construction period of 10 days.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.