Abstract

Purpose – This chapter discusses the planning and construction of the bus rapid transit (BRT) system in Xiamen, analyses the existing problems and puts forward proposals about the development of BRT, in order to provide a basis for similar systems in other cities. Methodology – The focus of the analysis is strategies for construction, including using BRT to guide urban development, building an integrated transport system, and making allowances for future upgrade of the system to light rail. In addition, the operating effectiveness of BRT is discussed. Findings – (1) At the initial stage of rapid urban expansion, BRT can be used to encourage transit-oriented development (TOD) in the expansion of urban space. (2) The construction of an integrated transport system and the strategies of providing for later upgrade of the system to light rail improves the service quality of public transport provides for rapid growth in the passenger flows, which not only meets the current passenger requirements, but also satisfies the needs for long-term urban development. Practical and social implications – (1) The elevated BRT has a significant influence on the urban landscape and environment, but the operating organization is inflexible. (2) The low price of the tickets has resulted in a serious operating loss.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call