Abstract

The objective of this study is to determine the effect of jet propeller on the damage of berthing structures combined of armoured slope with pile groups. For this purpose, scour measurements were performed for four types berthing structures, which were armoured slope with tandem arrangements of piles for two and three piles and with side by side arrangements of piles for two and three piles. The effect of gap between piles on damage was investigated. The damage level induced by propeller jet between piles was determined. The gaps were 1, 2, 3, and 4 times the pile diameter. Three different values of R pm (690, 820, and 950) were chosen for the tests. The diameter of circular piles is 40 mm. The slope ratio was 1/3 and the diameter of propeller was 10 cm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.