Abstract

To reduce the CO2 emissions from cement production, Portland cement (PC) is partially replaced by supplementary cementitious materials (SCM). Reactions of SCM with PC during hydration leads to the formation of CSH with more silicon and aluminum than in PC, which affects the stability and durability of such concrete. Therefore, it is crucial to determine the role of aluminum on CSH properties to predict the formed hydrate phase assemblages and their effects on durability.Aluminum sorption isotherms including very low Al concentrations have been determined for CSH with Ca/Si ratios from 0.6 to 1.4. Elemental measurements were performed with ICP-MS and ICP-OES. The presence of secondary phases was investigated by using thermogravimetric analysis and XRD.Higher dissolved concentrations of Al were observed at increased alkali hydroxide concentrations and thus higher pH values. High alkali hydroxide led to an increased Al(OH)4- formation, which reduced the Al uptake in CSH. This comparable behavior of Al and Si towards changes in pH values, points toward the uptake of aluminum within the silica chain both at low and high Ca/Si ratios. A higher Al uptake in CSH was observed at higher Ca/Si ratios, which indicates a stabilizing effect of calcium in the interlayer on Al uptake.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.