Abstract
We study the effect of service level constraint on the economic production quantity (EPQ) model with random defective rate. We first prove that the expected overall cost for imperfect quality EPQ model with backlogging permitted is less than or equal to that of the same model without backlogging. Secondly, the relationship between “imputed backorder cost” and maximal shortage level is derived for decision‐making on whether the required service level is achievable. Then an equation is proposed for calculating the intangible backorder cost for the situation when the required service level is not attainable. By including this intangible backorder cost in the mathematical analysis, one can derive a new optimal lot‐size policy that minimizes expected total costs as well as satisfies the service level constraint. Numerical example is provided to demonstrate its practical usage.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.