Abstract

Metro line 3 in Hanoi is being constructed using tunnels, which may affect nearby constructions. In addition, Hanoi’s earthquakes also pose risks to this Tunnel Boring Machine (TBM) line. This paper studies the impact of TBM construction on the surrounding houses along the line, as well as the impact of earthquakes on this line. A 3D numerical model was developed to simulate the static and dynamic behavior of TBM at station 9 in Metro Line 3. The results show that the maximum settlement at the ground surface under seismic load is significantly reduced from 4.6 mm to 0.1 mm when using the jet grouting method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.