Abstract

The effect of both the type of primary treatment (hydrolitic up-flow sludge blanket (HUSB) reactor and conventional settling) and the flow regime (batch and continuous) on clogging development in subsurface flow constructed wetlands (SSF CWs) was studied. Clogging indicators (such as accumulated solids, hydraulic conductivity and drainable porosity) were determined in an experimental plant with three treatment lines. Correlations were encountered between the solids accumulated and both saturated hydraulic conductivity and drainable porosity reduction over time (74.5% and 89.2% of correlation, respectively). SSF CW implemented with a HUSB reactor accumulated ca. 30% lower sludge (1.9 kg DM/m 2) than a system with a settler (2.5–2.8 kg DM/m 2). However, no significant differences were recorded among treatment lines concerning hydraulic parameters (such as hydraulic conductivity or porosity). Root system development contributed to clogging. Accordingly, planted wetlands showed between 30% and 40% and 10% lower hydraulic conductivity and porosity reduction, respectively, than non-planted wetlands.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.