Abstract

Electrochemical chloride extraction (ECE) is the removal of chlorides from the vicinity of the reinforcement leaving sound concrete intact. In a short period, 3 to 5 weeks, a high current, relative to other applications such as cathodic prevention or protection, is applied to the structure. Concrete shows a difference in pore size and pore size distribution before and after ECE treatment. Furthermore during ECE applications an increase in concrete resistance can be observed. An experimental study was conducted to investigate the influence of pore size on the resistance of artificial concrete pore liquid. The results showed that the resistance increases with decreasing pore size if a certain limit is exceeded. This limit appears to be related to the ion species and the concentration of the ions in the solution. INTRODUCTION CHLORIDE CONTAMINATION THROUHGH DIFFUSION CHLORIDE EXTRACTION THROUGH MIGRATION CONCRETE RESISTIVITY EXPERIMENTAL PROCEDURE EXPERIMENTAL RESULTS AND IMPLICATIONS CONCLUSIONS ACKNOWLEDGEMENTS REFERENCES

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call