Abstract
The repetitive sampling scheme is utilized in control charts to enhance their detection ability in process shifts. Their performance is usually evaluated under the assumption that the process parameters are known. In this article, we investigate the performance of the and S 2 charts under repetitive sampling when the process parameters are estimated from a preliminary in-control (Phase I) sample. We also present the exact expressions of the average run-length (ARL), standard deviation of run-length (SDRL) and average sample number (ASN) measures. A numerical analysis demonstrates that the effect of parameters estimation is significant when the Phase I sample and the sample size are small.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.