Abstract

This article examines the road bridge over the Karadarya River on the 5th km of the exploited Andijan –Pakhtaabad route R135 Highway. In this case, the effect on the load-bearing capacity of its foundation on ShNQ 2.05.03-12, which is currently in effect, on the replacement of the bridge Intermediate Unit (highway bridge designed and built according to the temporary load classes N30 and NK-80, N10 and NG60) into the temporary load class A14 and NK-100, or on the load-bearing capacity of the Intermediate Unit in increasing its load capacity, was considered. Recommendations have also been made on the maximum increase in the class of permanent and temporary load falling on the foundation of this bridge, which is in operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.