Abstract

Building, bridge or wind turbine maintenance requires manual dexterity tasks by a specialist rope-access trained workforce via two principal means: harness suspension of individual workers from above, or deployment of a suspended platform or cradle from which workers access the structure to be maintained. Currently no published research compares accuracy and efficiency of simulated maintenance tasks between these modalities. This study investigated manual dexterity task performance of peg placement and shape delineation in seated, standing and suspended environments in 16 healthy controls and 26 professional rope-access trained individuals. Both seated and standing assessments were superior to those suspended, and height of suspension, total mass and years of experience had no influence on the task outcome. These findings suggest that, where feasible, cradle suspension mechanisms which permit standing maintenance are favourable in terms of task efficacy and where feasible, should be considered for deployment in wind energy and other engineering applications.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.