Abstract
In the photovoltaic industry, a large number of photovoltaic power plants are not delivered according to construction schedules, resulting in considerable impacts on various stakeholders. Lead time has been identified as one of the key issues that urgently needs to be resolved. In this paper, we study a two-level photovoltaic supply chain consisting of the customer, the assembler, and the module manufacturer. The basic model, revenue-sharing model, and cost-sharing model are established to analyze the lead time of the module manufacturer and the assembler considering the decline of government subsidies. The results indicate that the cost-sharing contract can effectively control the lead time of the module manufacturer, but the revenue-sharing contract cannot exert this control. Furthermore, if the government subsidy drops from 0.0553 USD/kWh to 0.01195 USD/kWh, the production capacity will be reduced by approximately 37% due to the reduction in installed capacity, and the lead time will decrease by about 27%. For the module manufacturer, when the non-production capacity costs drop by 20%, the profit increases by about 58%. However, when the production capacity costs are reduced by 20%, the profit increases by only about 6%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.