Abstract

Pressure retarded osmosis (PRO) harvests the chemical potential difference between water sources of two different salinities and has been widely researched as a source of low carbon energy. This study identifies the cost-optimal design and operation using a nonlinear programming model to minimize the levelized cost of electricity (LCOE) of a PRO system for specified process and financial parameters. Our model includes a detailed finite difference module-scale model that considers the pressure drop along the module, nonconstant solution properties, local mass transfer coefficients, and equipment inefficiencies that previous analyses lacked. Under realistic case specifications and present-day costs, the expected median LCOE ranges from $2.37/kWh (seawater draw) to $0.11/kWh (Dead Sea draw). The optimistic case specifications, which assume significant improvements in process performance with no additional increase in cost, lower these median costs to $1.00/kWh (seawater draw) and $0.05/kWh (Dead Sea draw). These estimates exclude variable pretreatment costs and are likely to underestimate the actual LCOE. Membrane costs and maintenance are the primary cost components for all cases. Comparing the LCOE and capacity factor of PRO to other low carbon energy sources suggests that reductions in PRO component costs are unlikely to make PRO cost competitive with renewable energy technologies.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call