Abstract

The article describes the economic efficiency study results for several modernization cases of existing power equipment. The modernization cases assume the Pressurized Heat Recovery Steam Generator (PHRSG) usage with the twostage gas turbine. The T-100 cogeneration steam turbine and the K-300 condensing steam turbine were selected as the modernization object. The modernization cases are carried out with the high-power SGT5-2000E gas turbine and low-power GT-25PA gas turbine. New combined cycle gas turbine (CCGT) power plant construction case is considered for comparison as an example of typical Russian modernization case. The main economic efficiency indicators were considered - net present value (NPV); internal rate of return (IRR); pay-back period – simple (PP) and discounted (DPP); profitability index (PI). The article shows that all cases are investment attractive, but each case has its own specifics.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call