Abstract
Conductor scheme is one of most key issues in the design of the transmission lines project, and it is significant for the construction cost and safe operation of transmission lines project. It can be aslo concluded from analysis on application of existing conductor that the appropriate decrease of number of bundle conductor and increase of the conductor cross-section will reduce lines loss, which has remarkable social-economic benefits. In this paper, the economic analysis of large cross-section conductor is conducted based on ±800kV DC Project. Some useful suggestions are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.