Abstract
ABSTRACT Water infrastructure affects the quantity, quality, and environment of water. During reservoir construction, only the social-economic benefits were considered and the health of the downstream river was neglected. Due to the severe downstream river system, the operators and managers faced the challenge of the downstream ecosystem. Many scholars are concerned with the reservoir's optimum functioning, which considers social and economic advantages. Numerous significant opinions and research findings are being presented on ecological scheduling at the moment, both in China and overseas, which surely deepen the connotations of ecological scheduling and serve as the research basis and critical reference of this work. The influence of hydropower development on hydrological conditions, the categorization and calculation of environmental runoff, and the building and solution of ecological scheduling models are all discussed and researched in this work. The study examined how the ChiTan hydropower project influenced the Jinxi River's flow. The total hydrologic alteration calculated using RVA is 50.53%. The component analysis is also utilized to eliminate the statistical redundancy in the hydrologic indicators. The indicators’ monthly flow for July and August's mean minimum flow for 7 days are relevant indicators for the Jinxi River basin's hydrologic modification regime.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.