Abstract
Systems integration is essential for the design and execution of large, complex projects, but relatively little is known about how this task develops over time during the life cycle of a project. This paper builds on the concept of “disciplined flexibility” to describe how systems integration can be conceived as a dynamic process of maintaining stability, while responding flexibly to changing conditions. We examine the dynamics of systems integration through a case-study of Crossrail, the construction of London's new urban railway system, which will be called the Elizabeth Line when it opens for service. The balancing act of stability and change manifests during critical periods of the project life cycle as various interdependent systems evolve with different degrees of maturity. We identify how various types of reciprocal interdependencies in complex projects such as Crossrail – at the system and system of systems levels – require ongoing monitoring and control, and the mutual adjustment of tasks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.