Abstract

In this chapter we review the literature on the discrete time-cost tradeoff problem (DTCTP). We then present the four integer programming formulations of a version of DTCTP with irregular starting time costs from Szmerekovsky and Venkateshan (Comp and Oper Res 39(7):1402–1410, 2012). Specifically, the problem is an irregular costs project scheduling problem with time-cost tradeoffs. The empirical tests performed in Szmerekovsky and Venkateshan (Comp and Oper Res 39(7):1402–1410, 2012) are updated using the current version of CPLEX and similar results are found being driven by a reduced number of binary variables, a tighter linear programming relaxation, and the sparsity and embedded network structure of the constraint matrix.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.