Abstract

Legacy Way is a 4.25 km twin tunnel which will connect the Western Freeway at Toowong to the Inner City Bypass at Kelvin Grove in Brisbane. Legacy Way is an initiative of Brisbane City Council and has been designed and constructed by Transcity, a joint venture of Brisbane based BMD Constructions, Spanish construction company Acciona and tunnelling specialist Ghella from Italy. The project’s two parallel tunnels were bored with two hardrock tunnel boring machines (TBMs) through approximately 3500 m of Bunya Phyllite and 700 m of Neranleigh-Fernvale with a UCS in the range of 60–100 MPa. These double-lane motorway tunnels will have cross passages approximately every 120 m throughout the tunnel and a smoke duct to remove smoke out of the tunnel in case of a fire. The westbound tunnel was excavated by the TBM named ‘Annabell’, whereas the eastbound tunnel was excavated by the TBM named ‘Joyce’.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.