Abstract
Starting from the phenomenon that a large number of trains’ actual arrival &departure time deviate from specified time in train working diagram in the database ofhigh speed railway dispatching system, the paper analyzes the defects of current trainrunning time calculation method. Based on data mining theory, a section running timedeviation calculation model for high speed railway train is proposed. Then the propertiesof train section running time deviation are studied in three different cases (non-stop bothat the start and the end of section, stop at the end of section, and departure at the start ofsection) with the data from a Chinese railway bureau dispatching system, and its furtherinfluence on carrying capacity is analyzed. The results show that three deviation cases allfit Gauss distribution and the accumulative deviation time can increase the transportcapacity for more than 1 million passengers per year.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Hybrid Information Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.