Abstract
The Icarus T600 LAr TPC will have to work at shallow depth in the BNB beamline at Fermilab. To reduce the cosmics background, precise timing informations are needed from the new light detection system, based on 360 PMTs. For a precise time calibration a calibration system based on a fast laser was introduced with a resolution ∼ 100 ps.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have