Abstract

With the mature of single phase intelligent electric meter automation detection technology, concentrator and shift acquisition terminal also need to implement automated testing. The current domestic reality for some measuring equipment in the production of automated verification or a link in the test, which still have some technical problems. It combined with the necessary human intervention, virtually increased the cost and certain security hidden danger, make the lost of the role of automation and automated verification or testing is true meaning. However, how to realize the automation of collection terminal detection is mainly to solve the problem. For intelligent electricity information collection system construction, the problems arising from the use and application, put forward to realize the automatic acquisition terminal detection scheme, for the domestic intelligent electricity information acquisition terminal test provide beneficial guidance and reference.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call