Abstract

AbstractSludge arisings in the Hong Kong Territories are predicted to increase from the current level of 44 300 tDS/annum to 314000 tDS/annum. This has led to a need to examine the treatment and disposal facilities required for the future. Disposal facilities were found to be restricted, with virtually no suitable land for a liquid disposal route and a sea route limited to the present quantities. Only landfill remained as the major disposal outlet, but this is also limited by the moisture absorbence capacity of the emplaced material and limiting metal concentrations.In order to match the sludge production to the disposal outlet capacity, a series of process options was considered. Transportation studies using pumping, road and sea networks were undertaken and the environmental impact assessment of introducing thermal technologies was reviewed. Finally the various options were evaluated using a modified version of the Water Research Centre's WISDOM model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.