Abstract

The purpose of the work is the development of fuzzy model gas-insulated switch type HGF 100/2 B,C GEC ALSTHOM to determine the total mined-out resource.Research methods. The study was conducted through expert interviews, that became the basis for the construction of the fuzzy model of gas-insulated circuit breaker to determine the total mined-out resource. This model is implemented in MATLAB Fuzzy Logic Toolbox using the mathematical apparatus of fuzzy sets and fuzzy logic.The obtained results. The authors developed the fuzzy model which obtained the numerical value of the total resource developed gas-insulated circuit breaker with the influence of aggregate factors such as the condition of mechanical and switching systems, the state of arc suppression medium and isolation.Scientific novelty.The authors developed the new fuzzy model of gas-insulated circuit breaker to determine the total developed resource, which uses the information available for measurement or observation.Practical significance. This model is used for gas-insulated switch type GEC ALSTHOM HGF 100/2C operated on the Dnipro HPS-1, ODD-330 kV, cell L -211/1. The developed fuzzy model of assessment of the gas-insulated switch technical condition can be applied to all switches of this type.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call