Abstract

One of the most essential data of the social and economic development accepted all around the world is energy. The reasons such as the rapidity of the urbanization and industrialization and rapid increase in population cause to the continuous and indispensable increase in the demand for energy. While the demand for electricity energy is so high, what is important in terms of the user is the submission of the continuous and qualified energy to their own usage. In this study, the failures and power transformer failures occurring in Turkey electricity transmission system have been detected as hourly, monthly and annually and in this way; with the use of these data, the reasons for the failures have been examined and suggestions for solutions have been studied and it has provided opportunities for the conduction of preventive maintenance and repair works in the future. When the failure numbers of 380 kV lines have been examined, it is seen that some lines paint a very negative picture. When the failing lines have been monthly examined, it is seen that there is an accumulation in terms of failure in April-May and August-September periods. By means of this study; the failures occurring in the energy transmission lines have been classified on the basis of hour, month and year and the running reliability of the system in the transmission lines to be established in the future has been determined.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.