Abstract
The DESIR Collaboration proposes the construction of an experimental facility to exploit the low-energy beams from SPIRAL1, SPIRAL2 and S3. The high degree of purity required to push experiments towards the limits of stability will be achieved by the implementation in the SPIRAL2 production building of a high-efficiency RFQ cooler coupled to a high-resolution mass separator. Beams from the low-energy branch of the separator spectrometer S3 and from SPIRAL1 will allow complementary studies of refractory elements produced by means of fusion reactions as well as of light and intense exotic beams, respectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.