Abstract

This paper is a broad introduction to the issues facing designers of ship-to-shore linkspans for roll-on-roll-off ferry terminals, including mechanically lifted, pontoon, semi-submersible and integral tank types, outlining some key problems associated with each type. It discusses the development of design guidance since the 1994 ramsgate walkway collapse, leading to the publication of BS 6349-8 in the UK in 2007 with guidance on lifting equipment, transition geometry and loadings. Ship damage and wave action on linkspans are also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.