Abstract

The tokamak HT-7U project has been funded as a Chinese national project since 1998. The main object of the project is to build a nuclear fusion experimental device with divertor configuration, which is designed by the Institute of Plasma Physics, the Chinese Academy of Sciences (ASIPP). It is a full superconducting device, consisting of superconducting toroidal field (TF) coils and superconducting poloidal field (PF) coil. During the operation of the device, the operational parameter of device should be checked by technical diagnosis. This paper describes the design of circuit for checking short between every two parts of the HT-7U device. The main contents of design include circuit of data acquisition and data processing of computer.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.