Abstract

The hub city complex project of Chengdu railway south station is a large multi-function complex. The plane size of the two way maximum structure is 220m*146m, the main body of the structure is super long structure and the crack control is strictly required. This project uses the cast-in-situ unbonded prestressed concrete two-way ribbed floor system in the roof with high crack resistance, which greatly facilitates the construction, reduces the cost of the project and shortens the time limit. This article will introduce related contents of the project design for designers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.