Abstract
In 1988, Mobil completed the design phase of a new steamflood project. This project is in a thick, moderately dipping, unconsolidated heavy oil reservoir. The design takes advantage of the gravity drainage recovery mechanism in the thick reservoir, allowing vertical steam zone expansion with minimal steam breakthrough. The steamflood was designed to be economic in the late 1980's period of low oil prices. The design was completed with an interdisciplinary teamwork approach using concurrent studies for expediency. This paper was first presented at the 1989 California Regional Meeting in Bakersfield. The presentation for this meeting will conclude with an update of project performance since 1989.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.