Abstract

Abstract The operating and manufacturing characteristics of a flexible manufacturing system (FMS) mean that a traditional planning procedure of material requirements planning (MRP) and capacity requirements planning (CRP) cannot be followed. Thus the planning works between the master production schedule and the shop-floor control (SFC) systems are analysed and reassigned to the MRP, CRP and SFC systems. A CRP system designed for FMS is presented in this paper. It determines the requested capacities by carrying out part type selection, batch size determination and process plan selection, and by estimting tool slot requests. If there is insufficient capacity, the CRP system calculates the overtime hours required to complete the production of demand quantity for a specified part type.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.