Abstract

As for the construction of circulating water pipeline for Lumut thermal power station in Malaysia, the works was executed under the design/construction lump contract. Therefore, the hydraulic model test was carried out for the intake structure to confirm the hydraulic characteristics to satisfy requirements from the client. And rapi d construction was necessary for circulating water pipeline due to its long exten sion and short construction period. In this paper, we report the result of hydraulic model test for the intake structure and an outline of construction method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.