Abstract

Risk management decisions often demand the allocation of scarce resources in mitigation of different hazards. A quantitative basis for decision-making can be provided by a detailed risk assessment, in which the current risk and those that obtain under proposed projects can be evaluated. The average annual loss, or expected value, is not a useful measure of extreme risk. The conditional expected value, calculated for a series of probability ranges, provides measures of the risk that can be assembled into a decision table so that informed decisions can be made. The conditional expected value can be calculated even when the losses are only available in terms of a cumulative probability function.

Highlights

Read more

Summary

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.