Abstract

A data collection system for obtaining information which can be used to help determine the reliability and vailability of future fusion power plants has been installed at the Los Alamos National Laboratory's Tritium Systems Test Assembly (TSTA). Failure and maintenance data on components of TSTA's tritium systems have been collected since 1984. The focus of the data collection has been TSTA's Tritium Waste Tratment System (TWT), which has maintained high availability since it became operation in 1982. Data collection is still in progress and a total of 291 failure reports are in the data collection system at this time, 47 of which are from the TWT. 6 refs., 2 figs., 2 tabs.