Abstract

Group shop has the character of job shop and open shop, one robot is used to transport material, and the robotic cell produces multiple types of parts for a long time. In order to improve throughput, or minimize the cycle time, we establish the model of robotic cell, develop optimizing algorithm, and do computational experiments to find the better activity sequence for the robot.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.