Abstract
The BEPCII project is for upgrading the Beijing Electron Positron Collider to reach a higher luminosity. The cryogenic system has been firstly designed and deployed in BEPCII, which provides cooling capacity for SRF cavities, SCQ and SSM. The cryogenic control system consists of Siemens PLC for the refrigerator control and “PLC + IOC” for superconducting device control. The BEPCII machine commissioning with beam started in October 2006. This paper describes the design and the development of the cryogenic control system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.