Abstract
Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Buana Information Technology and Computer Sciences (BIT and CS)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.