Abstract

In this paper, we study the crane scheduling problem for a vessel after the vessel is moored on a terminal and develop both exact and heuristic solution approaches for the problem. For small-sized instances, we develop a time-space network flow formulation with non-crossing constraints for the problem and apply an exact solution approach to obtain an optimal solution. For medium-sized instances, we develop a Lagrangian relaxation approach that allows us to obtain tight lower bounds and near-optimal solutions. For large-sized instances, we develop two heuristics and show that the error bounds of our heuristics are no more than 100%. Finally, we perform computational studies to show the effectiveness of our proposed solution approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.