The Load Tap Changing (LTC) transformer and Shunt Capacitor (SC) bank are major devices for voltage and reactive power control in a distribution substation. Thus, the coordination operation of a LTC transformer and a SC bank is required to achieve better voltage and reactive power compensation at a distribution substation in the same time. This paper proposes coordinate control method of LTC transformer and SC bank to achieve better voltage and reactive power compensation and operation times of these two devices in the same time. The mathematical formulations of the proposed coordinate control method are introduced. Sample case studies are shown to verify the effectiveness of the proposed coordinate control method.