Abstract

Conclusions flowing from an investigation of the literature together with the results of two recent research studies suggest that the relationship quality between the client representative (CR), the design team and the team undertaking construction management activities is a major factor governing construction time performance (CTP). While the managerial performance of the manager of the construction team was found to be a pivotal factor, the interaction between the CR and the construction management team was found to be crucial in facilitating good CTP, i.e. achieving a fast build rate. One interesting and valuable insight gained from the research studies reviewed in the present paper suggests that selection of a CR should be based on the capacity of the CR to gain the confidence of the project team. The CR characteristics which are significantly associated with good CTP are also discussed. It is proposed that these provide useful selection guidelines for appointing the appropriate person or team to represent the client's interests within the project coalition.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.