Abstract

Construction projects for road infrastructure are typically undertaken outside and are very susceptible to unforeseen circumstances, such as natural catastrophes. An extensive workforce, high-quality building supplies, and schedule-driven construction implementation strategies were employed by the contractor to complete this project. The purpose of this research was to discover the steps that contractors need to follow in the event of a natural disaster while they are in the process of building, in order to prevent losses for them. The Ciawi Road Project in Cianjur, West Java, serves as the research case study. Ten variables can be used by contractors as preventive measures for disaster management for other contractors and other civil projects, according to data obtained from a questionnaire method and analysis using SPSS statistics.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call