Abstract

In order to explore the changes of mechanical properties of cable-stayed arch composite bridge in different construction stages, this paper takes a 136m tensed-string arch bridge as the engineering background, briefly describes the construction steps of grid lifting, and adopts Madis/Civil finite element analysis software for modeling. The actual construction process of the arch bridge is simulated by classifying different construction stages. The static and dynamic mechanical properties and stability of arch Bridges are studied. Through research and analysis, the main conclusions are drawn that the cables of the tensioned arch bridge bear part of the load of the original arch rib and girder.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.