Abstract
The construction of parallel tests from IRT-based item banks is discussed. Tests are considered to be parallel whenever their information functions are identical. Simultaneous and sequential parallel test construction methods based on the use of 0–1 programming are examined for the Rasch and 3-parameter logistic model. Sequential methods construct the tests one after another; simultaneous methods construct them all at the same time. A heuristic procedure is used for solving the 0–1 programming problems. Satisfactory results are obtained, both in terms of the CPU-time needed and differences between the information functions of the parallel tests selected.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.