Abstract

An emergency prevention and control management system for water environment pollution accidents will be constructed in Tianjin Binhai New Area. The basic information database of environmental risk sources and response system should be established. The construction of emergency disposal platform based on accident emergency monitoring and emergency response linkage mechanism. Through the introduction of on-site monitoring, pollution sources outfall information, equipment database, expert database, comprehensive analysis, optimization of pollution disposal program and information delivery of pollution source data can achieve effective control of sudden pollution accidents and timely disposal from the remote command to build integrative water pollution accident emergency disposal platform.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call